中文版 | English
tel:+86-532-87884567    phone:+86-18765954567    Qingdao North Torch Machine Tool Co.,Ltd
CONTACT

Qingdao North Torch Machine Tool Co.,Ltd

TEL:+86-532-87884567

PHONE:+86-532-87884567

E-MAIL:Annasun@ntmt.com.cn

ADD :No.78 of Fuqiang Road, Chengyang District,Qingdao.China

CONTACT:Mr Hu

Your location: 首页>>NEWS>>FAQ
FAQ

What is the sequence of disassembling the main parts of hori

TIME:2021-04-20 10:33:49 source:本站 CLICK:

The disassembly sequence of main parts of horizontal lathe is as followings:
 
1. Disassembly of Electric Components: Disassemble the control board, electromotor and illuminating lamp, etc.
2. Loose the joint bolt between spindle case and machine bed.
3. Separately discharge the tailstock and cutting tool carriage.
4. Disassemble the feeding box, drive screw,feed rod, joint sleeve of operation handle, dismount the feeding box.
5. Loose the joint bolts between bracket and machine bed, disassemble the sliding box.
6. Separate the sliding box and machine bed.